Handbook
Tolerance window: the stamp and the planned start of work
Someone standing at the site twenty minutes before the shift begins has not worked twenty minutes. The tolerance window compares the real stamp with the planned start of work and decides from when the time counts. This article covers the four cases, where the planned time comes from, which window size fits – and how to undo an adjustment in an individual case.
Frequently asked questions
Is the real stamp lost?
Which window size should I choose?
Why is the late side a separate switch?
Does it work without a rota?
Are manually recorded times adjusted too?
How do I undo a wrong adjustment?
Still have questions? We are happy to help.
Try Jobilino for free or book a personal demo.
Prefer to call right away? +43 664 5031382